• For Professionals

    Developers, Contractors & Investors
    I'm a Company
  • For Homeowners

    Renovation, Home & Building →
    I'm a Homeowner



Find Construction Risks Before They Reach the Site

Mexum helps developers, contractors, owners, and engineering teams review project documents, tenders, estimates, permits, and compliance requirements in days instead of weeks.

The platform detects missing information, code conflicts, estimate risks, tender inconsistencies, and documentation gaps across the full project lifecycle — from design and procurement to construction and handover



Construction Risks Are Expensive When Found Too Late

  1. ⏱ Delays and Frozen Work — Missing approvals, unclear drawings, and unresolved comments can stop procurement, site work, or handover.
  2. 💰 Rework and Cost Overruns — Quantity gaps, specification conflicts, and estimate errors turn into change orders, claims, and extra payments.
  3. ⚠️ Tender and Compliance Risk — Incomplete tender packages, code issues, and permit gaps reduce your chance of approval, award, or smooth project delivery.


From Documents to Action Plan in Three Steps
Upload your project or tender package. Mexum checks documentation, estimates, permits, and compliance risks, then gives your team a clear action plan before problems reach the site.
Upload the project package
Add drawings, specifications, estimates, permits, contracts, BOQ files, tender documents, or scanned construction files
Detect risks across the lifecycle
Mexum checks completeness, code conflicts, estimate gaps, tender inconsistencies, and delivery risks from design to handover.
Get a clear action plan
Receive a structured report with 🔴 critical issues, 🟡 questions, 🟢 recommendations, references, 🟢 and next steps for your team.
Where Mexum Helps

What Mexum Checks

Mexum reviews the documents that affect approval, cost, procurement, construction quality, and handover. The platform checks consistency, completeness, compliance, quantities, scope gaps, and risks across the full project package.

Design & Engineering Documents

.Architectural drawings
Structural drawings and calculations
MEP systems: HVAC, plumbing, electrical
Fire safety and life-safety requirements
Accessibility and zoning requirements
Drawing conflicts, missing details, and coordination gaps

Specifications, Permits & Compliance

Technical specifications and schedules
Material and equipment requirements
Permit documents and approval conditions
Applicable building codes and standards
Scope gaps between drawings,
specs, and contracts
Missing documents, unclear requirements, and compliance risks

Estimates, BOQ & Tender Documents

BOQ and cost estimate structure
Quantity gaps and duplicated items
Overpriced, missing, or inconsistent cost positions
Tender requirements and submission completeness
Contract documents and commercial risks
Change-order, claim, and budget overrun risks

Result: a structured risk report with critical issues, questions, recommendations, references, and next steps for the project team.

Traditional & innovative construction — including modular, prefab, and 3D-printed building projects

Built for Regional Construction Standards
Construction requirements are different in every market. Mexum lets teams select the project region and checks documentation against the relevant codes, standards, approval rules, and tender requirements.
  • United States & Canada
    Building codes, fire safety, accessibility, structural requirements, energy rules, OSHA-related documentation, and permit package completeness.
    Examples: IBC, IRC, ASCE, ACI, NFPA, ADA, NBC, CSA.
  • Europe & United Kingdom
    Eurocodes, national annexes, building regulations, fire safety, accessibility, energy performance, procurement documents, and handover requirements.
    Examples: EN 1990-1999, BS EN, DIN, DTU, CPR, EPBD, CDM.
  • Asia-Pacific
    Regional building codes, seismic requirements, fire and life-safety standards, local approval documents, contractor packages, and project-specific compliance rules.
    For cross-border projects, Mexum can align the audit with the selected jurisdiction and project requirements.
The exact checklist is configured by region, project type, document package, and delivery stage inside the platform.
Choose the Right Level of Project Control
Pricing depends on project size, document volume, region, and audit depth. Start with a focused check or run a full project risk review before tender, construction, or handover.

Try MEXUM for Free
Upload a document and get your first project risk check with promo code TRYMEXUM
Ready to Check Your Project Before It Costs You More?
Upload your project or tender package and get a clear report on missing documents, compliance risks, estimate gaps, tender inconsistencies, and issues that can delay approval, construction, or handover.